Reply To: APM gas package and Energy Conversions

#9186
Israr Ahmed
Keymaster

In v12 it doesn’t.

Is this for Historical Positions or Forward Positions ?

If its for Forward Positions then usually the CV is an estimate ( the Energy Conversion table getting updated with historical CV values ) and we’ve previously created the valuation curve as derived off (i) a curve with the unit into which conversion is required (ii) a CV curve , and then have the delta exposure going back to curve (I)

Download PDF version

This field is for validation purposes and should be left unchanged.